This update of the Opmantek Virtual Appliance was was released on 1 Nov 2016 and can be downloaded here: nmis-8.6.0G-VM-CentOS-6.8-64bit.zip. Installation and general use are described in more detail on the Getting Started page.

Highlights

  • CentOS updates up to and including 1 Nov 2016 have been applied (including an update of MongoDB to version 3.0.13).
  • The VM timezone is now set to UTC.
  • On first boot, new SSH host keys and application secrets are generated, and the number of custom user accounts has been minimised.
  • NMIS was upgraded to version 8.6.0G.
  • opReports 3 was upgraded to version 3.0.8.
  • Open-AudIT and Open-AudIT Enterprise were upgraded to version 1.12.8.2.
  • opEvents was upgraded to version 2.0.6.
  • opConfig was upgraded to version 3.0.1.
  • opFlow was upgraded to version 3.0.8.
  • opCharts was upgraded to the new major version 3.0.6.

...

  • NMIS was upgraded to version 8.5.4G.
  • Open-AudIT and Open-AudIT Enterprise were upgraded to version 1.5.1.
  • opEvents was upgraded to version 1.2.3
  • opconfig was upgraded to the new major version 2.1, which provides improved performance and much better interoperability with the other Opmantek products.
  • opCharts was upgraded to version 2.0.4.
  • opReports is now at version 2.6.0
  • opFlow was upgraded to version 2.5.0, which features capped database sizes and uses storage more robustly.
  • All CentOS 6.6 patches up to and including 25 Nov 2014 have been applied.
  • Opmantek application logs and variable files have been consolidated further (in /var/log and /data, respectively).
  • Numerous smaller configuration fixes, log rotation improvements and the like were made.

...